| Manufacturing sequence | Weld first, then hot-dip galvanize; identify other fabrication steps | Required sequence and scope of coated surfaces | Process declaration and drawing revision |
|---|
| Grid and panel dimensions | Clear opening or pitch, wire-diameter basis, width and length | Units, tolerances and measurement locations | Dimensional inspection record |
|---|
| Flatness, squareness and edges | Support conditions, diagonal checks and permitted projections | Drawing-defined limits and edge details | Measurements and identified panel photographs |
|---|
| Weld intersections | Required visual checks and any mechanical test | Agreed sampling plan, test method and acceptance limits | Inspection or test record as specified in the order |
|---|
| Zinc coating and repairs | Coating requirement, test method and any permitted repairs | Applicable coating specification; A90/A90M or A780 where agreed | Coating results and repair record when required |
|---|